We use cookies to improve your experience. Privacy Policy

Proof beats arguments.

Every flooring install documented on the job: timestamped, geolocated and locked before anyone asks. When a callback or claim comes in, you answer with the record, not a story.

iOS and Android · Built by a 20-year flooring inspector

9:41
InstallPROOF

1000 Airport Road, Edmonton, AB

Site condition captures7 of 7
GROUND FLOORWood
  • Ambient Temperature1
  • Ambient Humidity1
  • Sub-Floor Moisture1
  • Sub-Floor Temperature1
  • Expansion Gaps1
  • Flatness1
  • Wood Flooring Moisture Content1
Record locked · 2:14 PM
Print friendly Addendum

Trusted by Leading Flooring Retailers

Treeco Hardwood Flooring
Smith Bros. Floors Ltd.
Deerfoot Carpet & Flooring Inc.
The Carpet Studio Inc.
Nu Way Floors & Interiors
Treeco Hardwood Flooring
Smith Bros. Floors Ltd.
Deerfoot Carpet & Flooring Inc.
The Carpet Studio Inc.
Nu Way Floors & Interiors

Tap a logo to visit their website. We're proud to support our Founders!

For installation service providers

Running 40 crews? Get one standard record for all of them.

The program sets the rules, every sub documents differently, and the evidence leaves on a phone when a crew moves on. InstallPROOF puts every job, from every crew, into one record that stays with your account.

  • The same checkpoints on every job, whoever the crew is
  • Job records stay with your account when a sub moves on
  • Check the record before you roll a truck on a callback

At FCICA in Chattanooga, Nov 9–12? Book a time to meet

Today

5 crews · 5 jobs

2 records locked
  • Crew 03

    Basement · LVP

    Locked
  • Crew 07

    Main floor · Hardwood

    9 of 13
  • Crew 12

    Condo · Engineered

    Locked
  • Crew 18

    Kitchen · Tile

    Delivered
  • Crew 21

    Upstairs · Carpet

    5 of 9

Illustrative dashboard view

Walk through a real job, step by step.

Click through the app the way a crew uses it, from arrival on site to a locked record. About 90 seconds, no signup.

Trouble viewing it here? Open the walkthrough full screen

InstallPROOF in 30 seconds.

What gets captured, when it locks, and why it matters the day a floor gets questioned. Turn the sound on.

Then try the demo yourself

Three steps, built into the job.

  1. 1

    The crew captures on the job

    Photos, readings and checkpoints at the moments that matter, on the phone they already carry. The installer attests to their own work.

  2. 2

    The record locks

    Every entry is timestamped and geolocated, then locked once submitted. Nobody edits it after the fact.

  3. 3

    You answer with the record

    When a callback, backcharge or claim comes in, pull up the job file instead of rebuilding the story from memory.

Your next callback is coming. Have the record ready.